Foto 03-10-17 19 50 19

Challenging Rotterdam Project Movie

The movie shows all project stages; Design, Production, Transport and Installation of four 20-inch MLA’s for crude oil import.

The challenge of minimizing the downtime of replacement of the old loading arms has been met in every way.  This is achieved by installing all MLA’s, including the steel structure, in one time.