Cameron LNG

Greetings Cameron LNG!  

Welcome to your exclusive project portal.

At Kanon, we don’t just build loading arms; we engineer long-term operational security. This dedicated space is designed to show you exactly how our Symmetric Design and Rigid Pantograph System solve the specific challenges of cryogenic transfer.

 

 

Below, you will find technical references, maintenance roadmaps, and performance videos that demonstrate why Kanon remains the most reliable choice for the world’s most demanding LNG terminals. We are ready to bring this same level of Dutch engineering excellence to your facility.

 

Why Choose Kanon for LNG?

Kanon loading arms with LNG products are built with stainless steel components for extreme corrosion resistance and durability. Only soft consumables like seals, O-rings, and seats need occasional replacement. Hard components, including valves, ERC housings, and cylinders, are robust, long-lasting, and field-proven.
Bottom line: less downtime, lower maintenance costs, and smoother operations for operators.

Innovation & Engineering at Kanon

Kanon sets the benchmark for LNG reliability through advanced simulation and physical testing. From automated QCDC clamping trials to cryogenic cycle testing of our ‘Snap-in-Race’ swivel joints, we validate that every solution meets the highest OCIMF and EN1474 standards.

Our swivel joint integrates high-capacity bearings, designed to handle extreme loads without wear or leakage. Fully tested in accordance with NEN-EN 1474-3:2009 / ISO16904:2016, it ensures safe, reliable operation for hundreds of thousands of cycles, reducing maintenance and inspection needs.

Experience

Highly skilled and experienced service engineers are available to service and maintain customers’ equipment. They all have the required knowledge of  hydraulics, pneumatics, mechanics, and electronics. These service engineers each have a fully equipped service van at their disposal, including all necessary tools and spare parts.

Annual Inspection

Kanon’s inspection program ensures the performance of your equipment and includes preventive maintenance. Regular inspection will result in a lower cost of ownership and also safeguard the operator, the environment as well as your loading equipment. Kanon subsequently issues a dedicated inspection report for each individual loading arm.

Highlights

Kanon Cryogenic LNG MLA

From design to deployment: Witness the manufacturing and live cryogenic testing of KANON’s high-performance LNG loading arms for FSRU applications.

Kanon Loading Equipment Malaysia

From precision welding to large-scale assembly—see how KANON Loading Equipment Malaysia brings world-class engineering to life.

LNG bunker boom LNG London

Our Bunker Boom has been developed from existing, field proven hydrocarbon systems, applied for many years in leading ports such as Rotterdam, Amsterdam, Antwerp and Hamburg and is now successfully in action for LNG bunkering in both North-European and Asian ports

Thank you!

At Kanon, we prioritize safety and long-term reliability for all our global clients. Hence, we look forward to a successful collaboration with Cameron LNG. To learn more about our specialized cryogenic technology, please refer to the product brochure attached below.